土木在线论坛 \ 施工技术 \ 建筑施工 \ 凤凰城公园 工程施工组织设计

凤凰城公园 工程施工组织设计

发布于:2014-09-13 19:21:13 来自:施工技术/建筑施工 [复制转发]
内容简介:本工程为酒店、商场、写字楼、美食、娱乐为一体综合性高层民用建筑,建筑物南北向 324m ,东西向 114m ,主塔楼 14 层,基层为 7 层,夹层 1 层,地下一层。建筑面积地上 138943m2 ,总建筑面积 179890m2 该工程采用由梁板体系、柱及抗震墙组成的框架—抗震墙结构,在框架梁间设单向次梁,使楼板为单向板受力。在主楼下过街楼的第三层,设转换大梁,将底部大跨度柱网转换为上部小跨度柱网。基础形式为柱下独立承台,承台之间由钢筋混凝土拉梁连接。主楼高层下部采用Φ800 的钢筋混凝土浇筑桩,桩长33.3m,地下隧道、隧道入口以及附属楼梯下采用Φ600 钢筋混凝土浇筑桩,桩长24.3m。
文件格式:Word
文件大小:341 kB

申明:内容来自用户上传,著作权归原作者所有,如涉及侵权问题,请点击此处联系,我们将及时处理!

  • 筑城
    筑城 沙发
    本帖最后由 筑城 于 2014-9-13 19:23 编辑


    表1施工组织设计文字说明
    第一章 综合说明··············································1-16
    1 施工技术能力
    2 编制说明···················································2-4
    3 工程概况···················································5-12
    4 施工部署···················································13-16
    第二章 设备、人员动员周期和设备、人员、材料运到施工场地的方法·····17-20
    1 机械设备进场计划···········································17-18
    2 劳动力计划·················································18-19
    3 材料进场计划···············································19-20
    第三章 主要工程项目施工方法及质量保证措施·························21-77
    1 测量方案···················································21-23
    2 基础工程、观光通道工程施工方案及质量保证措施···············24-35
    3 基础排水和防止沉降措施······································36
    4 地下管线、地上设施、周围建筑保护措施························37
    5 主体结构主要施工方法及质量保证措施··························38
    6 装修工程施工方案···········································58-59
    7 防水工程施工方案···········································60-64
    8 各种管道、线路等非主体结构工程施工方法及质量保证措施·······65-75
    9 采用新技术、新工艺、新材料及专利技术·······················76-77
    第四章 管理办法及措施·········································78
    1 施工进度保证措施··········································78-111
    2 冬雨期施工措施·············································79-83
    3 施工工序协调措施···········································84
    4 工程项目管理办法及体系框图·································85-88
    5 保证安全施工措施及体系框图·································89
    6 保证工程质量管理措施及体系框图···························90-100
    7 现场文明施工措施···········································101
    8 施工现场环保措施·········································102-103
    9 施工现场维护措施···········································104
    10 总包管理及服务措施······································105-107
    11 工程交工后服务措施······································108-111
    表2 施工总平面布置图··································112
    表3 主要分项工程施工工艺框图··························112
    表4 施工进度计划······································ 112
    2014-09-13 19:21:13