六、工程项目(20句)
ENGINEERING PROJECT
135 A project execution is usually divided into some elementary phases, such as :engineering, procurement and transportation, and field construction. 一个工程项目的实施通常可分为几个基本阶段:工程设计、采购和运输、以及现场施工。
136 We are building an ethylene plant with an annual capacity of 300,000 metric tons.
我们正在建设一座年产三十万吨的乙烯工厂。
137 The contract number of this project is CJC78-8.
这个项目的合同号是CJC78-8。
138 The Seller(vendor) is Toyo Engineering Corporation(TEC)of Japan. 卖方(卖主)是日本的东洋工程公司。(简称TEC)
139 The Buyer (customer, client) is China National Technical Import Corporation.(CNTIC)
买方(主顾、顾客)是中国技术进口总公司。(简称CNTIC)
140 China National Chemical Construction Corporation (CNCCC) contracts for domestic and overseas chemical projects.中国化工建设总公司(简称CNCCC)承包国内和海外的化工工程。
141 We can contract to build turn-key plant, undertake single items of projects as a subcontractor or provide labor services.
我们可以承建成套工厂或分包单项工程或提供劳务。
142 The “UHDE” Corporation of Federal Germany takes part in this project as a patent licenser.(owner of the know-how)
联邦德国的“伍德”公司作为一个技术专利执证者(专门技术所有者)参加此项工程。
143 Are you the Seller’s Representative on the job site?
你是卖方的现场代表吗?
全部回复(6 )
只看楼主 我来说两句-
chixiaodao
沙发
温习下``
2007-09-13 10:17:13
赞同0
-
wjcfj80
板凳
不断提高自己。给上传一个工程英语及英文设计说明,大家交流吧。
-
eff3b3254901da63ff26.rar
文件大小 0 B
2007-09-12 15:19:12
赞同0
加载更多回复 举报
回复 举报