土木在线论坛 \ 建筑设计 \ 建筑资料库 \ 熟悉英语的高手解决几个简单的建筑题

熟悉英语的高手解决几个简单的建筑题

发布于:2011-03-22 20:37:22 来自:建筑设计/建筑资料库 [复制转发]
急用啊,各位大侠帮忙!!!!
Part III – Short Answer (5 points / question)

1. In order to strengthen the sense of neighborhood and community, a developer constructs a public square in the middle of housing development. The public square is an example of a __________..

2. The tops of the I-beam are called _________ and the center is called _______.


3. The most common type of beam used to support a balcony is called a _________ ______.

4. The first step in the construction of a bridge, built on piers or towers under the level of the water, is the placement of their ___________at the bottom of the river.


5. The moment of inertia is a quantity that characterizes the _______ __ _________moved away from the _________ ______ of a beam.


6. Prestressing is the most recent procedure devised to improve the performance of a _____________ _________.


7. The two basic methods of concrete prefabricated constriction are one by _________ and _________, and one by _________...


8. Information about street drainage in a city would be obtained by contacting the city’s _________ _________ ___________.

全部回复(2 )

只看楼主 我来说两句抢地板
  • zjb1983926
    zjb1983926 沙发
    我晕
    你不知道搞建筑的就是英语不行的吗
    呵呵
    2011-03-30 19:07:30

    回复 举报
    赞同0
  • cooperbai
    cooperbai 板凳
    这个真不会
    2011-03-30 17:27:30

    回复 举报
    赞同0
这个家伙什么也没有留下。。。

建筑资料库

返回版块

13.61 万条内容 · 209 人订阅

猜你喜欢

阅读下一篇

酒店施工方案

论文简介: 针对上海XX酒店室内装饰工程项目,我司组织相关人员认真研究全套施工图,召集了项目领导班子和各专业施工班组带班的成员,共同编写了本装修工程施工组织设计。 附件名:20113221300796892748.rar 文件大小:134K (升级VIP 如何赚取土木币)

回帖成功

经验值 +10