土木在线论坛 \ 人才招聘 \ 学生专栏 \ 求助专业翻译 英语达人请进

求助专业翻译 英语达人请进

发布于:2010-12-22 22:25:22 来自:人才招聘/学生专栏 [复制转发]
说明
1 梁定位详见相应的结构平面图
2 本图中x代表层号 x=
3 未注明的梁面标高为相应的结构楼层标高H,详见右图
(未注明的梁面标高为9m)
4 BKL按剪力墙连梁构造施工
梁高范围内,两侧墙钢筋应拉通配置,梁钢筋锚入两端剪力墙内》600
5 所有主次梁相交处,,在主梁上和次梁两侧均附加3根箍筋,间距50,直径与肢数同主梁箍筋,
6 未注明的附加吊钢筋均为2@12
7 2层轴线3-23~3-30局部梁配筋平面图另详结构施工图
把上面几句话翻译成英语 ,本来我是翻译了 但是怕翻译的外国人看不懂 ,这个是翻译给留学生看的 请大家指教啊
  • y176530355
    y176530355 沙发
    1 seeing the position of beams in the correspond structural plane drawing
    2 x stand for the number of layer in this drawing ,x=13~18
    3 the unspecified height of the face of beam is the height H of corresponding layer of building showed the details in the right chart
    4 bkll is constructed following by the construction of coupling wall-beam,the steel of both wall sides should be full-extend within the height of beam ,the length of the beam bar should extend into the two ends of shear wall by more than 600
    5 The both sides of the main beam and secondary beam are attached 3 stirrups, spacing 50mm, the same diameter and the same number of limb with the main beam stirrups, in the intersection of all primary and secondary beam
    6 The unspecified additional hanging bars are
    7 the second axles 3-23~3-30 in the partial plane drawing of structure and the plane structural drawing for resisting collapse can be seeing in the structural work drawing-44.
    2010-12-22 22:44:22

    回复 举报
    赞同0
这个家伙什么也没有留下。。。

学生专栏

返回版块

23.92 万条内容 · 127 人订阅

猜你喜欢

阅读下一篇

现在大四的工作找的怎么样了?

现在大四的工作找的怎么样了?

回帖成功

经验值 +10