发布于:2010-11-25 10:14:25
来自:建筑结构/钢结构工程
[复制转发]
************************************
*** Report of Data Checking ***
************************************
---------------------
| total information |
---------------------
-----------------------
| section information |
-----------------------
------------------------
| Geometry information |
------------------------
***** Floor No. 1 *****
------------------------------
| total information of floor |
------------------------------
--------------------
| node information |
--------------------
--------------------
| beam information |
--------------------
----------------------
| column information |
----------------------
--------------------
| other information |
--------------------
***** Floor No. 2 *****
------------------------------
| total information of floor |
------------------------------
--------------------
| node information |
--------------------
--------------------
| beam information |
--------------------
Warn 76 : Lb < 0.2, Nb= 6 Lb= 0.20
Warn 76 : Lb < 0.2, Nb= 7 Lb= 0.20
Warn 76 : Lb < 0.2, Nb= 62 Lb= 0.20
Warn 76 : Lb < 0.2, Nb= 63 Lb= 0.20
----------------------
| column information |
----------------------
--------------------
| other information |
--------------------
-----------------------------
| vertical load information |
-----------------------------
Floor No. 1 Nload = 894
Floor No. 2 Nload = 370
-------------------------
| wind load information |
-------------------------
Floor No. 1 Ntw = 1 Njw = 0
Floor No. 2 Ntw = 1 Njw = 0
该如何改正呢?谢谢大家帮忙:(
全部回复(4 )
只看楼主 我来说两句回复 举报
6,7,62,63号梁太短,
Lb 指梁长,Lb < 0.2,不是梁长小于0.2m ,Nb=6指第6号梁。
回复 举报