Laying Off Circular Curve by Method of Deflection
Angels at Deflection Point
ZHANG Xian-yun
(School of Resources and Environment, GUT, Gui yang 550003,China)
Abstract:Starting from the comparison between different methods for laying off circular curve, this paper presents a completely new method of deflection angles at deflection point, which is easy to compute, convenient to set out, increasing exactness and reducing amount of work.
Key words: deflection point; method of deflection angles; circular curve; lay off
1).主点测设
①ZH点的测设:
在JDi上架设仪器完成对中整平,将望远镜瞄准JDi-1,制动照准部。拨动水平度盘变换手轮,将水平度盘读数变换为0o00′00″。保持照准部不动,以望远镜定向。从JDi出发在该切线方向上,量取切线长TH,得到直缓ZH点,打桩定点。
②HY点的测设:
保持照准部不动,以望远镜定向。从ZH出发在该切线方向上,量取X0得到垂足,在该垂足上用十字架定出垂直于切线方向的垂线,并从垂足沿该垂线方向量取Y0得到HY点,打桩定点。
③QZ点测设:
先确定分角线方向。当路线左转时,顺时针转动照准部至水平度盘读数为时,制动照准部,此时望远镜视线方向为分角线方向。当路线右转时,顺时针转动照准部至水平度盘读数为时,制动照准部,然后倒转望远镜,此时望远镜视线方向为分角线方向。
在分角线方向上,从JDi量取外距EH,定出QZ并打桩。
④HZ点的测设
转动照准部,将望远镜瞄准JDi+1,制动照准部,望远镜定向。从JDi出发在该切线方向上,量取切线长TH,得到缓直点HZ,打桩定点。
⑤YH点的测设:
保持照准部不动,以望远镜定向。从HZ点出发在该切线方向上,向JDi量取X0得到垂足,在该垂足上用十字架定出垂线方向,并从垂足沿该垂线方向量取Y0得到YH点,打桩定点。
2)切线支距法进行带缓和曲线的曲线详细测设
①切线支距法先测设缓和曲线上各点,其测设方法与圆曲线切线支距法相同。
②在切线上由ZH始量Td,即可确定HY或YH点的切线。利用该切线,按圆曲线切线支距法测设圆曲线部分。
③曲中点QZ测设后和原主点放样所得QZ位置进行比较,横向误差不大于0.1米,纵向误差不超过± (L为曲线长度),则满足精度要求。
3)偏角法进行带缓和曲线的曲线详细测设
①如图2-11-3所示,在ZH或HZ处置仪,完成对中、整平工作。按与偏角法测设圆曲线一样进行缓和曲线部分的测设。比较详测和主点测设所得的HY点,进行精度校核。
②圆曲线部分各点的测设须将仪器迁至HY或YH点上进行。这时需要先定出HY或YH点的切线方向。
③仪器置于HY(或YH)点上,瞄准ZH(或HZ)点,水平度盘配置为b0(当路线右转时,配置水平度盘读数为360°- b0),旋转照准部至水平度盘读数为0°00¢002并倒镜,此时视线方向即为HY(或YH)点的切线方向。
④根据HY(或YH)点的切线方向,按无缓和曲线的圆曲线一样测设圆曲线部分,直至QZ,若通视条件好,可一直测至YH点。比较详测和主点测设所得的QZ、YH点,进行精度校核。
四、仪器和工具
经纬仪、钢尺、皮尺、花杆、木桩、铁锤、测钎、十字架、竹桩、记录板、小红纸。
五、注意事项
1. 测设时注意校核,保证准确性和精度,尤其是主点位置不能错。
2. 切线支距法测设曲线时,为了避免支距过长,一般由ZH点或HZ点分别向QZ点施测。