土木在线论坛 \ 水利工程 \ 水利工程资料库 \ Hydropower Development: Experience

Hydropower Development: Experience

发布于:2009-03-21 14:34:21 来自:水利工程/水利工程资料库 [复制转发]
论文简介:

Abstract: Nepal is situated in the lap of Mount Everest and bordered by China to the North and India to the
0 0 0 0
22°N - 30 27°N and longitudes 80 04°E - 88 12°E. The
south, east and west is located between latitudes 26
2
. has diverse physical characteristics in topography, climate, geology
country with total land area of 147,181 km
and land use system. The country is predominantly mountainous and the elevation ranges from 64 meter to 8848
meter above sea level. The mean annual precipitation ranges from more than 6000 mm along the southern slopes
i.e. in central Nepal to less than 250 mm in the northern central portion near Tibetan Plateau. Varying annual
precipitation between 1500 mm to 2500 mm predominates over most of the country. Based on the hydrological
3
with an average
data, estimated annual run-off from 6000 rivers and rivulets of Nepal is about 220 billion m
precipitation being 1530 mm per year.



附件名:20093211237617266355.zip

文件大小:444K

(升级VIP 如何赚取土木币)

这个家伙什么也没有留下。。。

水利工程资料库

返回版块

1.35 万条内容 · 209 人订阅

猜你喜欢

阅读下一篇

上程水电站施工组织设计简述

论文简介: 摘 要:上程水电站可行性研究阶段的施工组织设计,主要研究了该土石坝施工导流布置、坝体填筑规划、地下引水发电系统施工规划等技术问题。工程采用河床一次断流、土石围堰挡水、隧洞导流、主体工程全年施工方式,施工组织设计中还对料场选择与开采、主体工程施工、施工总布置及对外交通等进行设计研究。 附件名:20093211237616562871.zip 文件大小:131K

回帖成功

经验值 +10