背景
Background
由于休耕时间长,在前钢铁厂Schalker Verein的场地上有一些 "二手自然"。对于长期的城市发展,一个以独栋建筑为核心的内部绿色轴线被提出,并成为一个高质量的商业园区的核心以供新成立的公司使用。
Due to the long fallowing time there was some ‘second-hand nature’ available on the site of the former steel mill Schalker Verein.For long-term urban development, an inner green axis with solitary buildings has been proposed to become the centrepiece of a high-quality business park for start-up companies.
广场
The square
从市中心向西到该地区的发展是由三个广场组织的。堡垒广场和节日广场突出了高度差,形成了两个大小合适、结构设计合理的通道区域,并通向矿仓库和铁路线之间的宽敞空间。
The development from the city centre to the West into the area is organized by three squares. The Bastion Square and the Festival Square accentuate the height difference and form two suitably sized and structurally designed access areas and lead over to the generous space between the ore bunker and the railway line.
堡垒广场
The Bastion Square
在市中心的方向上,Schalke Verein的场地上有一座砖砌的堡垒,同时突出并包围了控制中心纪念碑。坡道提供了无障碍通道,也适合骑自行车的人从Hohenzollern
stra?e到有槐树的平坦广场区域。
In the direction of the city centre, the grounds of the Schalke Verein are presented with a bastion made of brickwork which at the same time highlights and encloses the control centre monument. A ramp offers a barrier-free access also suitable for cyclists from Hohenzollernstra?e to the flat square area with pagoda trees.
堡垒广场
The bastion square
节日广场
The Festival Square
节日广场位于控制中心的东侧,其帆形广场从槐树林中剥落,犹如一片空地。节日广场的自由开放区域的尺寸也为更大的活动提供了空间。三根照明柱倾斜在混凝土墙的斜坡上,将集中的光线投射到沥青地面上。
The Festival Square is located to the East of the control centre, whose sail-shaped plaza peels out of the pagoda tree grove like a clearing. The dimension of the free and open area of the Festival Square also offers space for bigger events. Three lighting pillars tipped in the slope of the concrete wall throw concentrated light onto the asphalt surface.
节日广场
The festival square
地堡广场
The Bunker Square
在西部,200米长的混凝土雕塑被开发,在步行式地堡部分的南部,沥青路面标志着地堡前院是一个运动和锻炼区。
In the Western part, the 200-meter-long concrete sculpture is developed. South of the walk-in bunker section, an asphalt surface marks the Bunker forecourt as a sports and exercise area.
细节
Details
项目信息
地点:德国
景观设计:PLANERGRUPPE OBERHAUSEN
其他规划:TOR 5 ARCHITECTS, BOCHUM (城市竞赛);DSGN, MüNSTER(咨询滑冰系统);KüHNERT ENGINEERING OFFICE, BERGKAMEN(交通规划)
城市竞赛:2001年,一等奖
规划:2003年至2008年
实现:建设第1部分:2009-2010年;建设第2部分:2011-2014
总面积:约35公顷
空间面积:约4公顷
图片来源:Claudia Dreysse
Location: Germany
Landscape architects: PLANERGRUPPE OBERHAUSEN
Other planners: TOR 5 ARCHITECTS, BOCHUM (URBAN COMPETITION); DSGN, MüNSTER (consulting skate system); KüHNERT ENGINEERING OFFICE, BERGKAMEN (traffic planning)
Urban competition: 2001, 1st PRIZE
Planning: 2003 to 2008
Realisation: CONSTRUCTION PART 1: 2009-2010; CONSTRUCTION PART 2: 2011-2014
Total area: approx. 35 ha
Space areas: approx. 4 ha
Photo credits: Claudia Dreysse
素材来源:landezine,由园景人转译
注:部分图片来源于landzine, 图文系园景人 (ID: xyzwin) 原创整理, 欢迎转载, 转载请输入“转载”授权,请注明来
0人已收藏
0人已打赏
免费0人已点赞
分享
园林景观实景
返回版块37.75 万条内容 · 288 人订阅
阅读下一篇
英国退休夫妇的露台花园露台:北 主人:娜塔莉·普里姆,一对退休夫妇,在艺术领域非常活跃 、 之前的露台 之前的露台 之前的前露台 天堂树成为亮点 逐步改造中。。。。。 室外厨房正在改造中。。。。 厨房四周种植了各种香草 方便烹饪 。
回帖成功
经验值 +10
全部回复(0 )
只看楼主 我来说两句抢沙发