Auto extinguish fire system quality common failing and defend way

(A)A fire auto report to the police and fire fight allied move control system
1.under construction pipeline spread establish break head, little line, connect ground, short circuit hour should adopt the following measure defend Ye:
(1)Construction front earnest carry on diagram paper conduct trial jointly with technique hand over bottom.Explicit report to the police cloth point position, equipments connect line need, pipeline of spread establish direction.
(2)The spot on-the-spot investigate.The spot actual and construction diagram paper carry on more thin turn, take out detailed of possibility project and construction project, include pipeline of model number, amount and reserve etc. circumstance.
(3)Under construction strict press above-mentioned construction project and nation electricity cloth line construction standard norm carry on construction.
(4)Pipeline spread establish finish after, earnest carefully check lead line of model number, amount whether and project and diagram paper agree with, lead line of insulate resistivity whether attain request.
(5)Implement over above-mentioned work preface combine attain qualified standard after, again carry on other work preface of construction.
2. head equipments of install loose move, can’t allied move, inaccuracy hour should adopt the following prevention measure:
(1)Before install acquaint with each equipments(locator, mold piece, hand report) of connect line way and install method.
(2)Aim at construction diagram paper firm exactitude of install equipments.
(3)With other fire fight equipments allied connect of allied move mold piece or signal mold piece, before install want special attention should fire fight equipments and fire fight allied connect of connect line way and control principle.
(4)Equipments install act according to 《a fire auto report to the police design and construction acceptance norm 》performance.
3. report to the police controller of install with adjust try for avoid appear adjust impassability, allied move expiration, circulate falsely often should press the following step carry on:
(1)Earnest reading report to the police controller of usage manual, check controller of work circumstance.
(2)After the controller exactitude install normal work of under the circumstance, close controller after, connect into head each report to the police back track, again switch on circulate and check system circulate circumstance.
(3)Carry on system plait distance, press logic procedure to probe into district and report to the police district carry on plait distance, allied move correspond of mold piece, control correspond of fire fight equipments.
(4)If appear correspond of allied move equipments motionless make, at this time should check mold piece work whether normal.If mold piece work normal, at this time should be beg allied move equipments of construction square match, common moderate solve.
(5)If appear stretch forward report to the police break down or always report to the police, or experiment don’t report to the police, should check stretch forward whether damage or replace stretch forward.
(6)be check adjust try completion above-mentioned qualified after, square can get into try circulate, end carry on acceptance.

  • xuexi999123
    xuexi999123 沙发

    资料很好,谢谢!

    2018-01-07 09:27:07

    回复 举报
    赞同0
这个家伙什么也没有留下。。。

市政公用工程

返回版块

3.11 万条内容 · 188 人订阅

猜你喜欢

阅读下一篇

请教一个电力电缆沟接地问题?

一般的电力电缆沟槽都会要求20~30米进行一次跨接地,从图纸上看,一般都是从沟下面进行跨接,但我在工地上看到的是从上面进行跨接,不管是排管位置还是U型槽位置,请问从上面进行跨接会不会有什么不利影响?

回帖成功

经验值 +10