In addition to the design for the stadium itself, the task involved an urban masterplan for the site of about 8 hectares. The new national arena is located on a strip of land that runs from east to west, with the A6 motorway to the north and a planned new road and tramway connection to the south, the latter creating a central traffic and interchange hub close to the stadium. Here, in addition to the sunken parking lot, gmp have also designed the new service building for the city of Luxembourg’s Service des Sports.
The size of the pitch and the facilities at the new arena follow international guidelines, meaning that both the top UEFA stadium category IV and that of the International Rugby Board (IRB) are achieved. The stadium features an orthogonal layout with a single tier and diagonally-truncated corner areas, with the grandstand reaching all the way down to the edge of the pitch. Towards the south, a building block accommodates the functional facilities for VIPs, the press, players, and officials.
There, directly above the main entrance from the forecourt at the new Boulevard Kockelscheuer, is the access to the business foyer with adjoining press area and multifunctional room, which can also be used independently of sports events. The loadbearing structure of the grandstand roof consists of a grid of double-angulated steel girders that are tapered to reflect the internal forces; the grid of girders rises from all sides of the arena and, at its highest point, carries the pitch lighting system.
With its 9,900 seats, the new stadium is rather small in relation to global standards. For this reason, the design was aimed at creating the atmosphere of a football arena also at this scale while also, at the same time, achieving a significant presence in the urban ensemble. To achieve this the designer developed a uniform facade structure, as well as a simple geometric loadbearing structure. The diamond-shaped folded metal plate structure of the facade has a unifying effect on the overall volume of the building.
In addition, at the second level high above the building and seen from outside, the line of lighting fixtures marks the dimensions of the pitch. At this exposed site, this creates a dynamic and sculptural feature that can be seen by both stadium visitors and those driving by. The effect is particularly noticeable at night when the pitch lighting and the illuminated facade structure radiate out to the city.
0人已收藏
0人已打赏
免费0人已点赞
分享
公共建筑设计
返回版块51.16 万条内容 · 431 人订阅
阅读下一篇
办公室装修的步骤和流程首先做什么?首先,我们要做好计划准备工作。从租赁办公室,选址开始,一系列的手续,而且这些手续未办理,物业是觉对不允许装修的。接下来要划分好办公室的区域,确定办公室装修需要的功能,和装修公司沟通好装修风格等问题,否则无法开始设计。在寻找装修公司和设计师的时候,首先要考虑好他们是否具备工装经验,是否具备办公室空间装修经验,空间投入使用后肯定会暴漏出很多设计施工的不合理问题,客户部可以预知费用高。工程质量,进度都难以保障。
回帖成功
经验值 +10
全部回复(1 )
只看楼主 我来说两句 抢板凳新的国家体育场坐落在一块东西延伸的土地上,北部是A6高速公路,南部是规划中的新公路和有轨电车连接,后者在体育场附近创建了一个中央交通和立交枢纽。在这里,除了沉没的停车场,gmp还为卢森堡的体育服务中心设计了新的服务大楼。
回复 举报